NH 25A over CONNECTICUT RIVER

VERMONT STATE LINE · County 009, New Hampshire · Built 1937 · 2 Lanes · 3,625 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
020300620012400
Year Built
1937
Reconstructed
2002
Length
132.2 m (433.7 ft)
Max Span
129.5 m
Width
7.8 m (25.6 ft)
Lanes
2
Daily Traffic
3,625
Material
Steel
Design
Arch - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.