NH156 over PAWTUCKAWAY RIVER

.5 MI. N. RAYMOND TL · County 015, New Hampshire · Built 1942 · 2 Lanes · 3,075 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
020101080002000
Year Built
1942
Reconstructed
1986
Length
7 m (23 ft)
Max Span
6.1 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
3,075
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.