US 3 over UPPER AMMONOOSUC RIVER
4.4 MI FROM LANCASTER TL · County 007, New Hampshire · Built 1995 · 3 Lanes · 5,412 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
44.595192, -71.511508
This bridge is in worse condition than 15.9% of bridges in County 007. The average bridge in New Hampshire is 0 years old; this one is 31 years old.
Nearby Bridges
NH110 over ROARING BROOK
Built 1962
WINTER STREET over ROARING BROOK
Built 1956
US 3 over SL&ARR
Built 1959
EMERSON ROAD over UPPER AMMONOOSUC RIVER
Built 1982
GUILDHALL ROAD over CONNECTICUT RIVER
Built 1984
GUILDHALL ROAD over CONNECTICUT RIVER
Built 1984
NORTHSIDE ROAD over NASH STREAM
Built 1977
C3007 over CUTLER MILL BROOK
Built 1975
C3004 over CUTLER MILL BROOK
Built 1968
C3003 over CUTLER MILL BROOK
Built 2005
Bridge Details
- Structure #
- 019801060011200
- Year Built
- 1995
- Length
- 71.6 m (234.9 ft)
- Max Span
- 35.1 m
- Width
- 17.5 m (57.4 ft)
- Lanes
- 3
- Daily Traffic
- 5,412
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.