C3004 over CUTLER MILL BROOK

0.5 MI JCT TH 4 + TH 5 · County 009, Vermont · Built 1968 · 2 Lanes · 50 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
100515000505151
Year Built
1968
Length
12.5 m (41 ft)
Max Span
11.6 m
Width
6.3 m (20.7 ft)
Lanes
2
Daily Traffic
50
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$297,000
Total Project Cost
$347,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.