NH103 over ANDREW BROOK

2.1 MI FROM BRADFORD T.L. · County 013, New Hampshire · Built 1962 · 2 Lanes · 5,102 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
018001320007400
Year Built
1962
Length
11.9 m (39 ft)
Max Span
10.4 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
5,102
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.