NH103 over ANDREW BROOK

3.8 MI FROM BRADFORD TL · County 013, New Hampshire · Built 1937 · 2 Lanes · 4,837 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
018001040009200
Year Built
1937
Reconstructed
1982
Length
8.8 m (28.9 ft)
Max Span
7.6 m
Width
14.8 m (48.6 ft)
Lanes
2
Daily Traffic
4,837
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.