NH 9 over OLD NH 9 GRANITE LK OUT

1.1 MI E SULLIVAN TL · County 005, New Hampshire · Built 1994 · 3 Lanes · 6,118 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
017800600010600
Year Built
1994
Length
88.2 m (289.4 ft)
Max Span
43.4 m
Width
16.7 m (54.8 ft)
Lanes
3
Daily Traffic
6,118
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.