CENTRE ST over OTTER BROOK

4.46 MI GILSUM TL. · County 005, New Hampshire · Built 1981 · 2 Lanes · 664 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
024600940006400
Year Built
1981
Length
25.9 m (85 ft)
Max Span
24.4 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
664
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.