CENTRE ST over OTTER BROOK
4.46 MI GILSUM TL. · County 005, New Hampshire · Built 1981 · 2 Lanes · 664 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.993536, -72.1947
This bridge is in worse condition than 50.5% of bridges in County 005. The average bridge in New Hampshire is 0 years old; this one is 45 years old.
Nearby Bridges
NH 9 over OTTER BROOK
Built 2020
OLD CONCORD ROAD over GRANITE LAKE OUTLET
Built 1932
OLD CONCORD ROAD over GRANITE LAKE OUTLET
Built 1932
NH 9 over CONRAD ROAD
Built 1994
REC AREA ACCESS RD over OTTER BROOK
Built 1967
MURDOUGH HILL ROAD over NH 9
Built 1994
OLD NH 9 over GRANITE LAKE OUTLET
Built 1932
OLD NH 9 over GRANITE LAKE OUTLET
Built 1932
REC AREA ACCESS RD over OTTER BROOK
Built 1967
NH 9 over BOYS CAMP ROAD
Built 1994
Bridge Details
- Structure #
- 024600940006400
- Year Built
- 1981
- Length
- 25.9 m (85 ft)
- Max Span
- 24.4 m
- Width
- 9.9 m (32.5 ft)
- Lanes
- 2
- Daily Traffic
- 664
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000