NH 3A over WILDLIFE STREAM

0.1 MI. SOUTH OF MAAR · County 011, New Hampshire · Built 2011 · 3 Lanes · 10,291 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
016102340007800
Year Built
2011
Length
7.9 m (25.9 ft)
Max Span
7.3 m
Lanes
3
Daily Traffic
10,291
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000