FEE TPK over WIECZOREK DR
1/4 MILE SOUTH FROM TOLL · County 011, New Hampshire · Built 2010 · 7 Lanes · 29,696 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
42.913569, -71.464897
This bridge is in worse condition than 17.7% of bridges in County 011. The average bridge in New Hampshire is 0 years old; this one is 16 years old.
Nearby Bridges
TOLL PLAZA ACCESS over FEE TPK NB ON-RAMP
Built 2010
FEE TPK NB RAMP over WIECZOREK DR RAMP
Built 2011
WIECZOREK DR over US 3
Built 2011
WIECZOREK DR over MERRIMACK R NH 3A CSX
Built 2011
NH 3A over WILDLIFE STREAM
Built 2011
WIECZOREK DR over LITTLE COHAS BROOK
Built 2011
NH 3A BROWN AVE over COHAS BROOK
Built 1986
GREENFIELD PARKWAY over RIDDLE BROOK
Built 2000
BEDFORD ROAD over FEE TPK
Built 1990
US 3 over FEE TPK
Built 2013
Bridge Details
- Structure #
- 001901950008500
- Year Built
- 2010
- Length
- 59.7 m (195.9 ft)
- Max Span
- 25.9 m
- Width
- 78 m (255.9 ft)
- Lanes
- 7
- Daily Traffic
- 29,696
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.