SALMON STREET WB over MERRIMACK RIVER CSX RD
.3MI W JCT US 3 · County 011, New Hampshire · Built 1970 · 2 Lanes · 17,799 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
43.003183, -71.467961
This bridge is in worse condition than 81.8% of bridges in County 011. The average bridge in New Hampshire is 0 years old; this one is 56 years old.
Nearby Bridges
RAMP E(CAMP ST) over CSX
Built 1970
SALMON STREET EB over MERRIMACK R CSX RD RAMP
Built 1970
SOUTH RAMP over I-293 FEE TPK
Built 1957
NORTH RAMP over I-293 FEE TPK
Built 1957
I-293 NH 3A TPK N over BLACK BROOK
Built 1956
I-293 NH 3A TPK S over BLACK BROOK
Built 1956
BRIDGE STREET EB over I-293 NH 3A CSX MERR R
Built 1988
BRIDGE STREET WB over I-293 NH 3A CSX MERR R
Built 1990
FRONT STREET over BLACK BROOK
Built 1974
I-293 FEE TPK over STARK WAY
Built 1956
Bridge Details
- Structure #
- 016101060007200
- Year Built
- 1970
- Reconstructed
- 1999
- Length
- 261.5 m (857.9 ft)
- Max Span
- 50.3 m
- Width
- 11.3 m (37.1 ft)
- Lanes
- 2
- Daily Traffic
- 17,799
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.