I-293 FEE TPK over STARK WAY

1.9MI S HOOKSETT T.L. · County 011, New Hampshire · Built 1956 · 4 Lanes · 46,106 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
016100910006300
Year Built
1956
Length
9.1 m (29.9 ft)
Max Span
8.2 m
Width
33.5 m (109.9 ft)
Lanes
4
Daily Traffic
46,106
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.