NH106 over SOUCOOK RIVER

2.6 MI FROM CONCORD TL · County 013, New Hampshire · Built 1977 · 2 Lanes · 12,131 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
015500740008600
Year Built
1977
Reconstructed
2018
Length
55.5 m (182.1 ft)
Max Span
27.1 m
Width
18.1 m (59.4 ft)
Lanes
2
Daily Traffic
12,131
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.