NH 9 over SOUCOOK RIVER

PEMBROKE TL · County 013, New Hampshire · Built 1936 · 2 Lanes · 8,465 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
005201600018800
Year Built
1936
Reconstructed
1989
Length
54.3 m (178.1 ft)
Max Span
21.3 m
Width
14.9 m (48.9 ft)
Lanes
2
Daily Traffic
8,465
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.