I-93 SB over BEAVER BROOK

Derry T/L · County 015, New Hampshire · Built 2020 · 4 Lanes · 42,082 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
015401590009900
Year Built
2020
Length
23.9 m (78.4 ft)
Max Span
22.9 m
Width
22.9 m (75.1 ft)
Lanes
4
Daily Traffic
42,082
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.