I-93 NB over KENDALL POND ROAD

.2 MI S OF LONDONDERRY TL · County 015, New Hampshire · Built 1962 · 4 Lanes · 41,528 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
006300540006700
Year Built
1962
Reconstructed
2021
Length
33.5 m (109.9 ft)
Max Span
9.4 m
Width
22.9 m (75.1 ft)
Lanes
4
Daily Traffic
41,528
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.