I-93 PARKWAY over WALKER BROOK

7.3 MI N WOODSTOCK T.L. · County 009, New Hampshire · Built 1985 · 2 Lanes · 11,599 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
014800920010900
Year Built
1985
Length
9.3 m (30.5 ft)
Max Span
4.5 m
Width
28.5 m (93.5 ft)
Lanes
2
Daily Traffic
11,599
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.