NH101 over OTTER BROOK

1.5 MI FROM MARLBORO TL · County 005, New Hampshire · Built 1933 · 2 Lanes · 11,538 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
013601660005000
Year Built
1933
Length
25 m (82 ft)
Max Span
21.3 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
11,538
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.