US202 over MILL TAIL RACE

1.7 MI TO PETERBORO TL · County 005, New Hampshire · Built 1937 · 2 Lanes · 7,405 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
013401750008900
Year Built
1937
Reconstructed
1956
Length
7.6 m (24.9 ft)
Max Span
6.7 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
7,405
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.