US202 NH124 over CONTOOCOOK RIVER

3.0 MI PETERBORO TL · County 005, New Hampshire · Built 1938 · 3 Lanes · 12,068 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
013401550008400
Year Built
1938
Reconstructed
1958
Length
11.6 m (38.1 ft)
Max Span
10.1 m
Width
19.8 m (65 ft)
Lanes
3
Daily Traffic
12,068
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.