NH119 over CONNECTICUT RIVER NECRR
AtT THE BORDER · County 005, New Hampshire · Built 2024 · 2 Lanes · 8,409 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
42.849897, -72.552167
This bridge is in worse condition than 14.9% of bridges in County 005. The average bridge in New Hampshire is 0 years old; this one is 2 years old.
Nearby Bridges
NH119 over CONNECTICUT RIVER
Built 1920
NH119 over CONNECTICUT RIVER
Built 1920
NH119 over CONNECTICUT RIVER
Built 1920
US 00005 ML over WHETSTONE BROOK
Built 1938
CITY 00ELM over WHETSTONE BROOK
Built 1966
CITY ELLIOT over WHETSTONE BROOK
Built 1946
CITY WILMS over WHETSTONE BROOK
Built 1930
I 00091 ML over I 91 NB OVER MAPLE ST
Built 1960
I 00091 ML over I 91 SB OVER MAPLE ST
Built 1960
US 00005 ML over WEST RIVER
Built 1987
Bridge Details
- Structure #
- 012500430004400
- Year Built
- 2024
- Length
- 580.8 m (1905.5 ft)
- Max Span
- 110 m
- Width
- 14.9 m (48.9 ft)
- Lanes
- 2
- Daily Traffic
- 8,409
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.