NH119 over CONNECTICUT RIVER
0.3 MI E VERMONT SL · County 005, New Hampshire · Built 1920 · 2 Lanes · 8,535 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
42.850703, -72.550628
This bridge is in worse condition than 90.2% of bridges in County 005. The average bridge in New Hampshire is 0 years old; this one is 106 years old.
Nearby Bridges
NH119 over CONNECTICUT RIVER
Built 1920
NH119 over CONNECTICUT RIVER NECRR
Built 2024
NH119 over CONNECTICUT RIVER
Built 1920
US 00005 ML over WHETSTONE BROOK
Built 1938
CITY 00ELM over WHETSTONE BROOK
Built 1966
CITY ELLIOT over WHETSTONE BROOK
Built 1946
US 00005 ML over WEST RIVER
Built 1987
CITY WILMS over WHETSTONE BROOK
Built 1930
I 00091 ML over I 91 NB OVER MAPLE ST
Built 1960
I 00091 ML over I 91 SB OVER MAPLE ST
Built 1960
Bridge Details
- Structure #
- 012500420004400
- Year Built
- 1920
- Reconstructed
- 1988
- Length
- 90.5 m (296.9 ft)
- Max Span
- 61 m
- Width
- 6.4 m (21 ft)
- Lanes
- 2
- Daily Traffic
- 8,535
- Material
- Steel
- Design
- Truss - Thru
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.