CENTER ROAD over US202 NH 9

2.2MI W HENNIKER T/L · County 011, New Hampshire · Built 2002 · 2 Lanes · 2,316 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
012201370005100
Year Built
2002
Length
35.7 m (117.1 ft)
Max Span
31.7 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
2,316
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.