US202 over N BRANCH RIVER

0.5 MI FROM ANTRIM TL · County 011, New Hampshire · Built 1988 · 4 Lanes · 5,929 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
012201170003500
Year Built
1988
Reconstructed
2001
Length
34.1 m (111.9 ft)
Max Span
15.2 m
Width
18.4 m (60.4 ft)
Lanes
4
Daily Traffic
5,929
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.