I-95 SB over TAYLOR RIVER

3.75 MI N of MA S/L · County 015, New Hampshire · Built 2018 · 4 Lanes · 43,466 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

42.933769, -70.863006

This bridge is in worse condition than 10.4% of bridges in County 015. The average bridge in New Hampshire is 0 years old; this one is 8 years old.

Nearby Bridges

Bridge Details

Structure #
011101200010300
Year Built
2018
Length
25 m (82 ft)
Max Span
22 m
Width
23.1 m (75.8 ft)
Lanes
4
Daily Traffic
43,466
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.