TOWLE FARM ROAD over NH101
0.3 MI FROM JCT. RT 95 · County 015, New Hampshire · Built 1995 · 2 Lanes · 2,242 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.945392, -70.850992
This bridge is in worse condition than 30.1% of bridges in County 015. The average bridge in New Hampshire is 0 years old; this one is 31 years old.
Nearby Bridges
TOWLE FARM ROAD over I-95
Built 1974
I-95 over ACCESS ROAD
Built 1950
NH 27(EXETER RD) over CSX(ABD)
Built 1926
NH 27 over NH101
Built 1996
NH101 WB over KING STREET
Built 1961
NH 27 over I-95
Built 1976
NH101 over DRAKESIDE ROAD
Built 1963
NH101 over NHRR(ABD)
Built 1963
NH101 EB over I-95
Built 1999
I-95 NB over TAYLOR RIVER
Built 2018
Bridge Details
- Structure #
- 011101350014400
- Year Built
- 1995
- Length
- 28.7 m (94.2 ft)
- Max Span
- 26.8 m
- Width
- 14.5 m (47.6 ft)
- Lanes
- 2
- Daily Traffic
- 2,242
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.