NH 33 over WINNICUT RIVER

1.4 MI FROM STRATHAM TL · County 015, New Hampshire · Built 1959 · 2 Lanes · 17,736 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 4 Poor
Superstructure 7 Good
Substructure 7 Good

Location

43.036094, -70.848008

This bridge is in worse condition than 93.9% of bridges in County 015. The average bridge in New Hampshire is 0 years old; this one is 67 years old.

Nearby Bridges

Bridge Details

Structure #
010201100010000
Year Built
1959
Reconstructed
2004
Length
19.8 m (65 ft)
Max Span
18.3 m
Width
14.9 m (48.9 ft)
Lanes
2
Daily Traffic
17,736
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.