NH 26 over CORSER BROOK

3.0 MI W OF RTE 16 · County 007, New Hampshire · Built 1954 · 2 Lanes · 981 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
008000520015100
Year Built
1954
Length
7.9 m (25.9 ft)
Max Span
7.3 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
981
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.