BALSAMS BK DR PVT over BALSAM POND BROOK

0.3 MI WEST OF DIXVILLE · County 007, New Hampshire · Built 2008 · 2 Lanes · 20 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
005002020006000
Year Built
2008
Length
9.3 m (30.5 ft)
Max Span
8 m
Width
6.9 m (22.6 ft)
Lanes
2
Daily Traffic
20
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.