I-93 US 4 SB over MERRIMACK RIVER

1.5 MI N. JCT RT3 · County 013, New Hampshire · Built 1959 · 2 Lanes · 25,801 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
005201360011600
Year Built
1959
Reconstructed
1988
Length
159.7 m (524 ft)
Max Span
57.3 m
Width
15.8 m (51.8 ft)
Lanes
2
Daily Traffic
25,801
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.