WEST PORTSMOUTH ST over I-93 US 4

1.4 MI N. JCT 132 · County 013, New Hampshire · Built 2000 · 3 Lanes · 4,541 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
005201250011800
Year Built
2000
Length
78.9 m (258.9 ft)
Max Span
42.1 m
Width
19.5 m (64 ft)
Lanes
3
Daily Traffic
4,541
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.