WASHINGTON STREET over CANAL INLET

0.6 MI FR US 3 · County 013, New Hampshire · Built 1975 · 2 Lanes · 2,533 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
005200480008200
Year Built
1975
Reconstructed
2021
Length
23.2 m (76.1 ft)
Max Span
21 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
2,533
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.