TREMONT STREET over CONTOOCOOK RIVER

CONCORD TL · County 013, New Hampshire · Built 1955 · 2 Lanes · 6,767 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
002601310003500
Year Built
1955
Reconstructed
1992
Length
82 m (269 ft)
Max Span
31.7 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
6,767
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.