NH 12 NH103 over SUGAR RIVER
3.8 MI FROM VERMONT SL · County 019, New Hampshire · Built 1996 · 2 Lanes · 6,584 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 8 | Very Good |
| Substructure | 6 | Satisfactory |
Location
43.375492, -72.345719
This bridge is in worse condition than 52.5% of bridges in County 019. The average bridge in New Hampshire is 0 years old; this one is 30 years old.
Nearby Bridges
NH 11 NH103 over SUGAR RIVER
Built 1981
CITIZENS STREET over SUGAR RIVER
Built 1959
NH 12 NH103 over RED WATER BROOK
Built 1997
THRASHER ROAD over RED WATER BROOK
Built 1900
PLAINS ROAD over SUGAR RIVER
Built 1974
RED WATER BROOK RD over RED WATER BROOK
Built 1925
NH 12A over SUGAR RIVER
Built 1967
STRAND ROAD over RED WATER BROOK
Built 1991
NH 12 NH103 over CONNECTICUT RIVER
Built 1969
NH 12 NH103 over CONNECTICUT RIVER
Built 1969
Bridge Details
- Structure #
- 004701220009800
- Year Built
- 1996
- Length
- 37.2 m (122 ft)
- Max Span
- 36 m
- Width
- 13.6 m (44.6 ft)
- Lanes
- 2
- Daily Traffic
- 6,584
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.