US302 NH 18 NH116 over I-93

2.1 MI SUGARHILL TL · County 009, New Hampshire · Built 1959 · 2 Lanes · 3,454 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
002401110006400
Year Built
1959
Reconstructed
1988
Length
87.8 m (288.1 ft)
Max Span
22.6 m
Width
15.5 m (50.9 ft)
Lanes
2
Daily Traffic
3,454
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.