RIVER STREET over SACO RIVER OVERFLOW

0.50 M. FROM US302 · County 003, New Hampshire · Built 2015 · 2 Lanes · 473 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
001701090011400
Year Built
2015
Length
6.9 m (22.6 ft)
Max Span
3.1 m
Lanes
2
Daily Traffic
473
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.