STANTON FARM RD over RAZOR BROOK

0.2 MI FR COBB RD · County 003, New Hampshire · Built 1991 · 2 Lanes · 96 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
001700950011800
Year Built
1991
Length
9.4 m (30.8 ft)
Max Span
8.8 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
96
Material
Wood or Timber
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.