NH101 EB over HOOKSETT ROAD

1.7 MI MANCHESTER TL · County 015, New Hampshire · Built 1972 · 2 Lanes · 28,293 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
001300800015300
Year Built
1972
Length
38.9 m (127.6 ft)
Max Span
36.8 m
Width
17.1 m (56.1 ft)
Lanes
2
Daily Traffic
28,293
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.