NH 28 over SUNCOOK RIVER

AT PEMBROKE TL · County 013, New Hampshire · Built 1958 · 2 Lanes · 7,989 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000401070009800
Year Built
1958
Reconstructed
2024
Length
66.3 m (217.5 ft)
Max Span
24.4 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
7,989
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.