ECHO VALLEY ROAD over COLD RIVER

161 FT FR NH RTE 123A · County 019, New Hampshire · Built 2006 · 1 Lanes · 96 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

43.185197, -72.2623

This bridge is in worse condition than 19% of bridges in County 019. The average bridge in New Hampshire is 0 years old; this one is 20 years old.

Nearby Bridges

Bridge Details

Structure #
000101360005700
Year Built
2006
Length
18.3 m (60 ft)
Max Span
18.3 m
Width
4.3 m (14.1 ft)
Lanes
1
Daily Traffic
96
Material
Steel
Design
Other
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.