NH123A over COLD RIVER

4.16 MI. FROM LANGDON TL · County 019, New Hampshire · Built 1961 · 2 Lanes · 369 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000101240005700
Year Built
1961
Reconstructed
2002
Length
48.2 m (158.1 ft)
Max Span
17.1 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
369
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.