BUFFALO DRIVE over SUMMERLIN PKW

LAS VEGAS · County 003, Nevada · Built 1994 · 8 Lanes · 32,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
I2063
Year Built
1994
Length
60.7 m (199.1 ft)
Max Span
30.2 m
Width
31.9 m (104.7 ft)
Lanes
8
Daily Traffic
32,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.