WASHINGTON AVE over US 95
WEST OF LAS VEGAS · County 003, Nevada · Built 1978 · 4 Lanes · 8,650 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
36.181211, -115.244317
This bridge is in worse condition than 82.9% of bridges in County 003. The average bridge in Nevada is 0 years old; this one is 48 years old.
Nearby Bridges
RMP US95N-SMRLN PW over US 95 & RAINBOW
Built 1989
RMP US95N-SMRLN PW over RMP US95S-RAINBOW
Built 1989
SUMMERLIN HOV over US 95N/S RAINBOW RAMPS
Built 2012
RMP EB SMRLN-US95N over US95
Built 2006
SR 595 RAINBOW BL. over US 95
Built 2007
RMP 95S to RAINBOW over SUMMERLIN PW & RAINB RMP
Built 2006
TENAYA WAY over BONANZA PED TRAIL
Built 2010
TENAYA WAY over SUMMERLIN PKWY
Built 2010
US 95 over DRY WASH
Built 1977
VEGAS DR over US 95
Built 1991
Bridge Details
- Structure #
- H1211
- Year Built
- 1978
- Length
- 76.8 m (252 ft)
- Max Span
- 39.6 m
- Width
- 24.6 m (80.7 ft)
- Lanes
- 4
- Daily Traffic
- 8,650
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $884,000
- Total Project Cost
- $1,326,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.