CC 215 over TROPICANA AVE

SW LAS VEGAS · County 003, Nevada · Built 2007 · 4 Lanes · 33,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
I2004S
Year Built
2007
Length
71.5 m (234.6 ft)
Max Span
37.2 m
Width
26.4 m (86.6 ft)
Lanes
4
Daily Traffic
33,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.