RUSSELL RD over CC 215

SW LAS VEGAS · County 003, Nevada · Built 2006 · 8 Lanes · 20,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
I2003
Year Built
2006
Length
77.9 m (255.6 ft)
Max Span
39.3 m
Width
40.8 m (133.9 ft)
Lanes
8
Daily Traffic
20,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.