CC 215E over DECATUR BL

SOUTH WEST LAS VEGAS · County 003, Nevada · Built 1999 · 4 Lanes · 18,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
I1995S
Year Built
1999
Length
46.3 m (151.9 ft)
Max Span
46 m
Width
28 m (91.9 ft)
Lanes
4
Daily Traffic
18,000
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.