CC 215 over RAIL ROAD

S.W OF LAS VEGAS · County 003, Nevada · Built 1998 · 4 Lanes · 96,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
G1994S
Year Built
1998
Reconstructed
2007
Length
74.2 m (243.4 ft)
Max Span
26.8 m
Width
30.5 m (100.1 ft)
Lanes
4
Daily Traffic
96,500
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.