I 580 over SR430 S VIRGINIA ST

RENO · County 031, Nevada · Built 1986 · 6 Lanes · 86,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
I1799
Year Built
1986
Length
76.3 m (250.3 ft)
Max Span
38.4 m
Width
41.6 m (136.5 ft)
Lanes
6
Daily Traffic
86,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$9,480,000
Total Project Cost
$12,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.