I 580 over SR659 McCARRAN BL

SOUTH RENO · County 031, Nevada · Built 1986 · 8 Lanes · 86,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
H1798
Year Built
1986
Length
66.4 m (217.8 ft)
Max Span
32.6 m
Width
45.7 m (149.9 ft)
Lanes
8
Daily Traffic
86,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$8,104,000
Total Project Cost
$12,157,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.