SIERRA ST over I 80
RENO · County 031, Nevada · Built 1968 · 4 Lanes · 7,650 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
39.534356, -119.817108
This bridge is in worse condition than 35.2% of bridges in County 031. The average bridge in Nevada is 0 years old; this one is 58 years old.
Nearby Bridges
VIRGINIA ST over I 80
Built 1970
CENTER ST over I 80
Built 1969
RALSTON ST over I 80
Built 1969
EVANS ST over I 80
Built 1969
WASHINGTON ST over I 80
Built 1970
SIERRA ST over UPRR
Built 2006
N VIRGINIA ST over UPRR
Built 2006
WEST ST over UPRR
Built 2006
N ARLINGTON AV over UPRR
Built 2006
N CENTER ST over UPRR
Built 2006
Bridge Details
- Structure #
- I 992
- Year Built
- 1968
- Length
- 66.1 m (216.9 ft)
- Max Span
- 21.9 m
- Width
- 19.5 m (64 ft)
- Lanes
- 4
- Daily Traffic
- 7,650
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,223,000
- Total Project Cost
- $1,834,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.